Vacuum Transfer and Pumping Case Studies
Case Study: Ensco 92 Drilling Rig - 92 tons of Sludge Removed from Tank
Location: Verolme Shipyard (Netherlands)
Operator: ENSCO
Removal of approximately 92 tons of sludge from a drains tank using vacuum transfer technology, whilst the rig was moored in the Verolme shipyard.
|
|
Read more...
|
Case Study: Nexen Scott Platform Vacuum Transfer Operation
Location: Offshore UKCS
Operator:NEXEN
KCA Deutag contracted Sureclean to remove cement and barite powders from six silos onboard the Nexen Scott Platform.
|
|
Read more...
|
|