Case Study: Asbestos Surveying
Location: Transocean 709
Asbestos survey of rig located off Nigeria.
Sureclean Scope
To carry out a Type 2 Asbestos survey of rig located off Nigeria.
Technical Challenges
- Logistics ensuring correct equipment was available and mobilized to carry out survey successfully
- Personnel requirements ensuring correct Visa and paperwork in place and Innoculations had been received
Restrictions
Off Duty Personnel rooms were surveyed either at beginning or end of shift. Liaison with Camp Boss and stewards to gain access without disturbing personnel.
Key Achievements
- Good liaison with client with regard to travel arrangements/logistics
- No accidents or incidents



